This site uses cookies and other tracking technologies to provide you with our services, enhance the performance and functionality of our services, analyze the use of our products and services, and assist with our advertising and marketing efforts.

Cookie Policy   Privacy Notice

Previous Next

Victor

Type 108 Boiler Acetylene Cutting Tips

Type 108 Boiler Acetylene Cutting Tips

Acetylene Cutting Tips - Type 108 for boiler tube removal

Where To Buy


Features

  • Tip is short to insert head and tip inside tube

Industries

  • Industrial and General Fabrication
  • Repair and Maintenance
  • Structural Steel Fabrication
  • Light Fabrication

Specifications

Fuel Specifications

0330-0058

Gas Pressure - Acetylene 3-5 psig
Gas Pressure - Cutting Oxygen 25-30 psig
Gas Pressure - Preheat Oxygen 3-5 psig
Total Acetylene Consumption 5-8 cfh
Total Oxygen Consumption 55-60 cfh
Total Preheat Oxygen Consumption 5-9 cfh
Gas Pressure - Acetylene 3-5 psig
Gas Pressure - Cutting Oxygen 30-35 psig
Gas Pressure - Preheat Oxygen 3-6 psig
Total Acetylene Consumption 6-10 cfh
Total Oxygen Consumption 60-65 cfh
Total Preheat Oxygen Consumption 7-11 cfh

Operating Specifications

0330-0058

Average Kerf Width .06 in.
Cutting Speed 24-28 in./min
Metal Thickness 3/8 in.
Tip Size 0 in.
Average Kerf Width .06 in.
Cutting Speed 20-24 in./min
Metal Thickness 1/2 in.
Tip Size 0 in.
x
×

Find the Closest Distributor

x

Find the Closest Distributor

x

x

Loading..