27 EXAMPLE: Assume single pass weld in 1/2-in. plate using single V procedure: a.   .41 lb. electrode/foot b.   21 ipm travel speed c.   1125 amps X 36 volts = 40,500 watts d.   assume 50% or 1/2 operating factor Cost per foot 1. Wire:   .41 x $.80/lb. = .328 $/ft. 2. Flux:    .41 x 2 x $.70/lb = .582 $/ft. 3. Power: 40500 / (5000 x 21) 0.10 $/Kw hr. = .040 $/ft. 4. Labor: $40.00/hr. / (5 x 21 x .5) = .762 $/ft. TOTAL = 1.71 $/ft.